Cari

Conducting flood assessment and Proposed Interventions for Missilya Wastewater

Permohonan untuk Proposal

Informasi Umum

Wilayah Palestina, Diduduki
   jeneen-west bank
   PWA/AFD/2025/021-CTD
   8 Jul, 2025
10 Agt, 2025
  
PALESTINIAN TERRITORIES - Palestinian Water Authority
   (i) The methodology is clear and complete: all services, organization described, resources mobilized, list of activities, risks and assumptions
(ii) The methodology is relevant: it brings an added value to the TORs and contains innovations
(iii) The work plan is detailed, realistic and in line with the TORs and proposed methodology
(iv) The number of experts and the expected number of working days for each expert are adequate to satisfactorily perform each activity.
(v) The allotment between experts on site and at headquarters, achieves the expected results
   English
   Pengadaan Nasional
70000 EUR
   Dipublikasikan: 8 Jul, 2025

Kontak Informasi

   Raed Sawafta
head of procurement unit
Palestinian Water authority
West Bank - Ramallah
Ramallah
Wilayah Palestina, Diduduki
   00972599814065
   Klik di sini

Barang, Pekerjaan dan Jasa

jasa pembuangan saluran kotoran

Additional resources

Teks Asal

Tolong dicatat bahwa pemberitahuan ini adalah hanya untuk informasi anda
Kami berusaha sebaiknya demi mendapatkan informasi yang tepat dan terbaru dalam situs kami, namun kami tidak jamin bahwa semua informasi yang tertera bebas dari kesalahan
Jika anda mempunyai saran-saran untuk memperbaikii/meng-update pemberitahuan ini, silahkan beritahu kami