Cari

2nd Corrigendum - Construction of Bridge on Bhulta–Araihazar–Bancharampur Road over the River Meghna on Public Private Partnership.

Permohonan untuk Proposal

Informasi Umum

Banglades
   50.01.0000.404.14.005.15-154
   16 Jul, 2026
19 Okt, 2026
Bangladesh Bridge Authority
   English
   Pengadaan Internasional
   Dipublikasikan: 16 Jul, 2026

Kontak Informasi

   Md. Abul Hossain
Project Director
Construction of Bridge on Bhulta-Araihazar-Bancharampur Road over the River Meghna PPP Project
Construction of Bridge on Bhulta-Araihazar-Bancharampur Road over the River Meghna PPP Project, Room #501, Setu Bhaban, New Airport Road, Banani, Dhaka-1212, Bangladesh
Banglades
   +880255058111 (Office)
   Klik di sini
   www.bba.gov.bd

Barang, Pekerjaan dan Jasa

pekerjaan tehnik dan pekerjaan konstruksi Persiapan proyek dan rancangan, estimasi biaya jasa konsultasi tehnik sipil jasa pengelolaan projek konstruksi Pekerjaan konstruksi jembatan diatas jalan/rel kereta Pekerjaan konstruksi jembatan jasa desain tehnik untuk konstruksi tehnik sipil Pekerjaan konstruksi jembatan jalan pekerjaan konstruksi untuk jembatan dan terowongan , lubang dan kereta api bawah tanah jasa desain jembatan jasa pendukung tehnik sipil

Dokumen dan lampiran penawaran

 
  • (661 KB; 16 Jul, 2026)
     Unduh dokumen

Teks Asal

Tolong dicatat bahwa pemberitahuan ini adalah hanya untuk informasi anda
Kami berusaha sebaiknya demi mendapatkan informasi yang tepat dan terbaru dalam situs kami, namun kami tidak jamin bahwa semua informasi yang tertera bebas dari kesalahan
Jika anda mempunyai saran-saran untuk memperbaikii/meng-update pemberitahuan ini, silahkan beritahu kami