Cari

Conduct Of Feasibility Study Of Construction Of Retaining Walls At Nyarwungo Health Center (EXPIRED)

pemberian kontrak

Informasi Umum

Rwanda
   8 Apr, 2026
Nyamagabe District
   English
   Yang Lain
4000000 RWF
   Dipublikasikan: 8 Apr, 2026

Kontak Informasi

   NYAMAGABE DISTRICT
Rwanda

Barang, Pekerjaan dan Jasa

Layanan bisnis: hukum, pemasaran, konsultasi, perekrutan, pencetakan dan keamanan

Additional resources

Contract award information

   CHEETAH ENGINEERING& SERVICE Ltd

Ringkasan

      

notice_title: Conduct Of Feasibility Study Of Construction Of Retaining Walls At Nyarwungo Health Center
local_title: Conduct of Feasibility study of Construction of Retaining walls at Nyarwungo Health Center
grossbudgetlc: 4000000.0
est_amount: 4000000.0
lot_details: 1: Conduct of Feasibility study of Construction of Retaining walls at Nyarwungo Health Center

Teks Asal


More information: Klik di sini
Tolong dicatat bahwa pemberitahuan ini adalah hanya untuk informasi anda
Kami berusaha sebaiknya demi mendapatkan informasi yang tepat dan terbaru dalam situs kami, namun kami tidak jamin bahwa semua informasi yang tertera bebas dari kesalahan
Jika anda mempunyai saran-saran untuk memperbaikii/meng-update pemberitahuan ini, silahkan beritahu kami