Cari

Replacement Of Patches Of Ofc (24F) By Laying Of Plb Hdpe Duct And Armored Ofc Including All Protective Materials And Commissioning Of The Links By Integrating With The Existing Ofc Including Mid-Section Splicing And Termination At Repeaters At Various Locations Of Bhubaneswar Territory Of Railtel/Eastern Region (Zone-2).

Permohonan untuk Proposal

Informasi Umum

   4 Des, 2025
   English
   Yang Lain
   Dipublikasikan: 4 Des, 2025

Teks Asal

10
Eastern
Works
RailTel/Tender/OT/ER/HQ/2025-26/1591, Dt. 04.12.2025

18/12/2025

Replacement of patches of OFC (24F) by laying of PLB HDPE Duct and armored OFC including all protective materials and commissioning of the links by integrating with the existing OFC including mid-section splicing and termination at repeaters at various locations of Bhubaneswar Territory of RailTel/Eastern...
Pilihan Keanggotaan

Dasar

Penuh

Perusahaan

US$550/tahun

US$1000/tahun

Biaya sesuai permintaan

Beli Beli Hubungi kami
Tolong dicatat bahwa pemberitahuan ini adalah hanya untuk informasi anda
Kami berusaha sebaiknya demi mendapatkan informasi yang tepat dan terbaru dalam situs kami, namun kami tidak jamin bahwa semua informasi yang tertera bebas dari kesalahan
Jika anda mempunyai saran-saran untuk memperbaikii/meng-update pemberitahuan ini, silahkan beritahu kami