Cari

Handling/Carrying Of Rejection Coal And Removal Dust From Coal Mill Area Of Barapukuria 275 Mw (Unit 3) Thermal Power Plant, Parbatipur, Dinajpur By Motor Truck Or Any Other Means,Including Loading-Unloading At Both Ends And Stacking Properly At S...

Permohonan untuk Proposal

Informasi Umum

   19 Mei, 2025
   English
   Pengadaan Nasional
   Dipublikasikan: 19 Mei, 2025

Teks Asal

5961113748,
27.11.2777.451.02.207.25-107 Date:18.05.2025,
LiveWorks,

Handling/Carrying of Rejection Coal and removal dust from Coal Mill area of Barapukuria 275 MW (Unit 3) Thermal Power Plant, Parbatipur, Dinajpur by motor truck or any other means,including loading-unloading at both ends and stacking properly at s...Ministry of Energy, Power and Mineral Resources,
Power Division,
Bangladesh...
Pilihan Keanggotaan

Dasar

Penuh

Perusahaan

US$550/tahun

US$1000/tahun

Biaya sesuai permintaan

Beli Beli Hubungi kami
Tolong dicatat bahwa pemberitahuan ini adalah hanya untuk informasi anda
Kami berusaha sebaiknya demi mendapatkan informasi yang tepat dan terbaru dalam situs kami, namun kami tidak jamin bahwa semua informasi yang tertera bebas dari kesalahan
Jika anda mempunyai saran-saran untuk memperbaikii/meng-update pemberitahuan ini, silahkan beritahu kami