Cari

Design, Engineering, Sitc Of 6.0 Mw Wind Farm On Epc Mode At Vocpa, Tuticorin Along With Civil Works And Power Evacuation System To Be Connected With Grid As Per Discom Norms Including Comprehensive O And M For 11Yrs With 02 Yrs Guarantee Period

Permohonan untuk Proposal

Informasi Umum

   12 Apr, 2025
   English
   Yang Lain
   Dipublikasikan: 12 Apr, 2025

Teks Asal

62.
12-Apr-2025 09:00 AM
08-May-2025 03:00 PM
09-May-2025 03:30 PM
Design, Engineering, SITC of 6.0 MW Wind Farm on EPC Mode at VOCPA, Tuticorin along with Civil works and Power evacuation system to be connected with Grid as per DISCOM norms including Comprehensive O and M for 11yrs with 02 yrs Guarantee period/MEE/PM/6MW-Wind/2025/2025_VOCPT_232711_1
V.O.Chidambaranar Port Trust
--...
Pilihan Keanggotaan

Dasar

Penuh

Perusahaan

US$550/tahun

US$1000/tahun

Biaya sesuai permintaan

Beli Beli Hubungi kami
Tolong dicatat bahwa pemberitahuan ini adalah hanya untuk informasi anda
Kami berusaha sebaiknya demi mendapatkan informasi yang tepat dan terbaru dalam situs kami, namun kami tidak jamin bahwa semua informasi yang tertera bebas dari kesalahan
Jika anda mempunyai saran-saran untuk memperbaikii/meng-update pemberitahuan ini, silahkan beritahu kami