Supply, installation, testing and commissioning of a 12MWp Solar PV power plant with 36MWh of Battery Energy Storage System , including a 13.5km of 33kV Evacuation line for BEC, Berbera, Somaliland.

Permohonan untuk Proposal

Informasi Umum

   10 Mar, 2025
   English
   Yang Lain
   Dipublikasikan: 10 Mar, 2025

Teks Asal

Somaliland’s Ministry of Energy and Minerals has issued a tender for the supply, installation, testing and commissioning of a 12MWp Solar PV power plant with 36MWh of Battery Energy Storage System , including a 13.5km of 33kV Evacuation line for BEC, Berbera, Somaliland. 




Deadline: 5 May 2025, 9.30am Hargeisa Local Time




A pre-bid conference shall be conducted physically by the...
Pilihan Keanggotaan

Dasar

Penuh

Perusahaan

US$550/tahun

US$1000/tahun

Biaya sesuai permintaan

Beli Beli Hubungi kami
Tolong dicatat bahwa pemberitahuan ini adalah hanya untuk informasi anda
Kami berusaha sebaiknya demi mendapatkan informasi yang tepat dan terbaru dalam situs kami, namun kami tidak jamin bahwa semua informasi yang tertera bebas dari kesalahan
Jika anda mempunyai saran-saran untuk memperbaikii/meng-update pemberitahuan ini, silahkan beritahu kami