In connection with the transformation of heating station No. 2 of the existing Lift Pump Station fed from the Baku Heat Electric Center into a modern type boiler house. Dismantling of the main cover and foundations of the district heating lines: asphalt concrete, with the help of breaker hammers, excavation of the soil with excavators with a capacity of 0.5 (0.5-0.63) m3 of Chalovu by loading it into dump trucks, soil group: 1 Depth 2 Manual digging of soil in sloped trenches up to m without fixings, soil group: 1 Excavation of soil with excavators with a bucket capacity of 0.5 (0.5-0.63) m3 by loading onto dump trucks, soil group: 1 Dump truck, 20 t transportation distance - 10 km. 1st class load. Making the foundation under pipelines: from sand