Cari

Upgrading Of The... Palpara Road Start From R&H Road Near Baidhyapara To Damudar Bridge.(Ch 0.00-820.00M) By Rcc At Ward No-04 Under Pirojpur Pourashava Pirojpur. Construction Of Rcc Drain With Footpath From Palpara Road Start From R&H Road Near Baidhyapara To Damudar Bridge.(Ch 0.00-820.00M) At Ward No-04 Under Pirojpur Pourashava Pirojpur.Installation Of Street Light Of Palpara Road Start From R&H Road Near Baidhyapara To Damuder Bridge(Ch0.00M-820.00M) At Ward No.04 Under Pirojpur Pourashava Pirojpur More

pemberian kontrak

Informasi Umum

   18 Jun, 2026
   English
   Yang Lain
   Dipublikasikan: 18 Jun, 2026

Teks Asal

167Ministry of Local Government, Rural Development and Co-operatives and
Local Government Division1252350, P.Poura/Tender/02/2025-26/W13
Upgrading of the... Palpara Road start from R&H road near Baidhyapara to Damudar Bridge.(Ch 0.00-820.00m) by RCC at ward no-04 under Pirojpur Pourashava Pirojpur.
Construction of RCC Drain with footpath from Palpara road start from R&H road near...
Pilihan Keanggotaan

Dasar

Penuh

Perusahaan

US$550/tahun

US$1000/tahun

Biaya sesuai permintaan

Beli Beli Hubungi kami
Tolong dicatat bahwa pemberitahuan ini adalah hanya untuk informasi anda
Kami berusaha sebaiknya demi mendapatkan informasi yang tepat dan terbaru dalam situs kami, namun kami tidak jamin bahwa semua informasi yang tertera bebas dari kesalahan
Jika anda mempunyai saran-saran untuk memperbaikii/meng-update pemberitahuan ini, silahkan beritahu kami