| |
|
1) TSR by TRT and Manually at Obligatory Point Deep Screening by BCM and Manually and TRR manually From Road, LGCE-SAGMA and STW-KTHA Section. 2) Proposed Construction of Pre-Cast Segmental RCC Box by the side Existing Bridge No. 1103/5 at 1103/12-13 between JKE-KYCE Station on Section by Open cut Method And Existing Bridge in to be Closed. 3) Provision of 3000mm dia (150mm dia Linish Bore) Deep Tube Well with Submersible Pumps and Pump House in KTE (S) Area. 4) Provision of 300 mm dia (150mm dia Finish) Bore) Deep tube Wells Submersible Pumps ad Pump House and Pipeline at MKO and CTHR. 5) Provision of Piped Water Supply At Patwara Station and Staff Quarters. 6) Provision of New FOB At Sleemnabad and Amdara Station under ADEN(E)KTE sub Division. 7) Proposed Rehabilitation of Existing arch Bridge under UP and DN main Line as Construction of ½.50 x 1.50 Precast RCC Box Segment At the Beside of Bridge and Existing Bridge to be Closed on JBP-MKP Section. 8) Carrying out Two Work under ADEN(E)KTE sub Division. 1) Harvey Repairs to Boundary Wall and Open Drain in New Railway Colony. 2) Heavy Repairs to Staff Quarters at station. 9) Construction of Intake/Jack Well and Infiltration Galleries Between Satna River and filter Plant. 10) Proposed Rehabilitation of Existing 4/1.25m FT/Slab Bridge as Jacketing of Piers and Abutment and Placement of Slandered 2/2.44m RCC Slab of Bridge at Section. 11) Proposed Replacement of Existing 1/7.00m Span Girder with 1.58 X 3.10m RCC Box under Up Main Line of Bridge No. 1238/1 at on Section.
Permohonan untuk Proposal
|
|
Tolong dicatat bahwa pemberitahuan ini adalah hanya untuk informasi anda
Kami berusaha sebaiknya demi mendapatkan informasi yang tepat dan terbaru dalam situs kami, namun kami tidak jamin bahwa semua informasi yang tertera bebas dari kesalahan
Jika anda mempunyai saran-saran untuk memperbaikii/meng-update pemberitahuan ini, silahkan beritahu kami
|
|
|